Hillrise Trustees Letter of 3/23/10 to CMHA

March 23, 2010
Cincinnati Metropolitan Housing Authority
Board of Commissioners
16 West Central Parkway
Cincinnati, Ohio 45202

Dear CMHA Board of Commissioners:

We, the trustees of the Cincinnati Business and Professional Women’s Retirement Living, Inc., (CBPWRL) are greatly appreciative of the opportunity to present to you our response to the College Hill Forum’s letter dated March 22, 2010 regarding Project Based Vouchers for the Hillrise Apartment building.

We had hoped that the meeting conducted on 3/18/10 between the CBPWRL, CMHA, Forum and mediator would start a cooperative process between the CBPWRL board and the College Hill Forum but it appears that the Forum does not share in that hope. CBPWRLI’s Hillrise Apartment facility is a 501(c) (4). As such it is run by a volunteer board of commissioners not unlike hundreds of facilities across the country. It is apparent from the Forum’s letter that they do not believe that the CBPWRL board is capable of renovating and maintaining the facility and that the renovation plan that has been produced is viable. We respectfully disagree. CBPWRL has made significant changes with regards to management, maintenance and security in the past 6 months. We have assembled the most experienced group of affordable housing consultants available in the Tri-State area to prepare a workable refinancing plan.

The Forum continues to make statements like “long-standing deplorable conditions at the Hillrise” and “CBPW failed to maintain, repair or reinvest in Hillrise during the past 40 years”. We believe these statements are both inaccurate and unfounded. The board is aware and has been trying to deal with a decline in the conditions of the Hillrise and neighborhood over the past few years with limited funding. Specific actions (chemical treatment, resident education and work with the Health Department) have been taken to address bed bugs. Both the property manager and maintenance technician has been replaced in an effort to improve on-site services and communication. Security improvements (lighting, fence repairs, evictions, resident education/awareness efforts, door locks etc.) have been completed. An emphasis to improve communication between CBPWRL, Hillrise residents, site management, the local police department and the College Hill community continues to be a priority for the board.

A Physical Needs Assessment of the facility was completed in 2004. Multiple refinancing plans for renovation have been completed over the last 5 years. Potential funding sources via tax credits (both 4% and 9%), City Rental Rehab funding, Federal Home Loan bank (FHLB), conventional financing and grants have been examined. All financing plans have come to the same conclusion. The only way for the financing plans to work is with increased rental income to support the debt. The only way for the rents to increase and for the building to remain affordable is with project based subsidies.

The Hillrise financing plan that was submitted with the PBV application is one that we feel provides the best future for the building. The Forum has insinuated that they are aware of a “respected organization” that has expressed interest in purchasing the Hillrise and competing for 9% tax credits for the renovation. CBPWRL examined 9% LIHTC in early 2008 and determined that the risk, fees, competitive nature of the application process and time required for closing was not in the best interest of the Hillrise. Also, as you know the LIHTC industry as a whole has been nearly decimated by the current economic crisis. We believe that tax credits is not the best option for the Hillrise.

CBPWRL, believes it has assembled the best team of affordable housing consultants to assist us with the refinancing and renovation of the Hillrise. Wallick Hendy, a known entity that provides management and development expertise. Creative Housing Solutions, Inc. an architectural firm that specializes in affordable housing renovation and has completed 850+ Physical Needs Assessments and numerous development refinancing plans. Stephanie Sweeney, grant writing specialists that focuses on Federal Home Loan bank applications.

The Forum has stated that “the Task Force has consulted several individuals familiar with construction and commercial renovation and all agree that some critical expenses in the proposal were unrealistic”. CBPWRL does not believe that these opinions are based in fact. To our knowledge no one has conducted an on site inspection of the Hillrise on behalf of the Forum. In our opinion it is impossible to assess a building component or system without seeing it.

CBPWRL consultants specialize in affordable housing renovation. A hard-cost budget of $2,500,000 has been established by detailed cost estimates. The Hillrise has enormous economy of scale because of its shared systems and compact design. The current Hillrise FHLB proforma has an average unit hard cost of $28,853/unit and a total development cost (i.e. hard + soft costs) of $37,064/unit. In comparison the St. Paul proforma had an average unit hard cost of $32,980/unit and a total unit development cost of $72,446-$85,981/unit. The stark difference between the plans is within the nature of the financing. Because the Forum does not have experience with affordable housing refinancing packages they are unable to differentiate between the two.

The Forum lists 5 items of disagreement. We would like to address each one:

  1. Age Restriction of 55 and Over- CBPWRL understands that if the PBV are awarded and a contract is negotiated with CMHA, then CBPWRL and the Hillrise must comply with the requirements of the contract. It is understood that a part of this contract will be to restrict occupancy to persons that are disabled and/or 55 and older.
  2. Live-in Manager- the Forum believes that a live in manager will greatly reduce incidents of residents calling police. Wallick Hendy’s responded by saying that in their experience (35 years in this industry) resident managers tend to “burn out”. They recommend that a combination of a full time resident manager (working hours) and a resident “care-taker” (live in person) and floor captains is a much better solution. CBPWRL concurs with their recommendation.
  3. New management employees not previously employed by Metro Management. We believe this request is simple discrimination. The current on site manager has been employed with Wallick Hendy for several years and has an impeccable resume. CBPWRL, is not willing to loose her because she was once employed by Metro.
  4. Private security- We believe that improvements in building security, entry systems, cameras and age restrictions will greatly improve the security concerns at the Hillrise. Resident leadership reports a substantial improvement in the on-site security in the past 6 months. They expressed a continued concern of drug and prostitution in the neighborhood.
  5. Bed bug infestation- CBPWRL, management and resident leaders continue to work with residents of the Hillrise to alleviate this problem. The building under goes monthly chemical treatments. Resident leaders are working with management to try and better educate people. Unit trash is taken immediately off site by Wallick Hendy so that contaminated furniture etc. is not recycled into the building.

CBPWRL, continues to examine its own bylaws and standards to look for ways to improve upon its oversight of this facility. Having said that, we do acknowledge that there is a reliance on the property manager to provide a professional service. We are confident that the Wallick Hendy management company, a company that has been in the affordable housing industry for 35 years is and will continue to provide that service to us. We also, believe that having CMHA involved with the building will serve to strengthen the improved oversight we are trying to achieve.

In summary, I fear that if PBVs are not awarded and the renovation financing obtained, conditions will only further deteriorate and the wellbeing of the residents will be threatened.

Sincerely,

Hillrise Board Trustees

Sandra Lett, President

Saturday, April 11, 2009

College Hill Property Sales, First Quarter 2009

Address Sale Date Sale Price Assessed Value Price vs Assess. New Owner Prior Owner   Property Number
5509 Belmont Ave 01/02/2009 $448,000 $1,135,000 -$687,000 Bayview Loan Servicing Ll Emrich Jon & Karl Com. 234-0003-0011-00
8121 Daly Rd 02/25/2009 $120,000 $303,220 -$183,220 Cba 2004-1 Ohio Holdings Llc Hitchcock Bertha Com. 247-0005-0312-00
1714 Cedar Ave 01/16/2009 $57,750 $212,620 -$154,870 Access Property Managemen Llc Gunn Sheila R Com. 233-0002-0001-00
1184 Homeside Ave 02/26/2009 $20,000 $165,000 -$145,000 Gundling Cortland Us Bank National Association Tr Com. 235-0003-0007-00
6519 Teakwood Ct 03/09/2009 $13,000 $142,400 -$129,400 Jones Bonnie L Secretary Of Housing And Urban Development Res. 247-0006-0157-00
1607 Larmon Ct 02/10/2009 $38,900 $148,280 -$109,380 Sherrod Theodore T New York Tr Bank Of The Res. 234-0003-0059-00
1738 Cedar Ave 03/27/2009 $60,000 $168,780 -$108,780 Homesales Inc Wright Gwendolyn Tr Res. 229-0004-0035-00
1184 Homeside Ave 02/17/2009 $60,000 $165,000 -$105,000 Us Bank National Association Tr Serjanyan Hasmik Com. 235-0003-0007-00
1532 Hollywood Ave 03/04/2009 $85,000 $182,280 -$97,280 Hockney Timothy S & Angela M Calendine Kristine Tr Res. 247-0001-0198-00
1153 Groesbeck Rd 02/02/2009 $27,500 $113,680 -$86,180 Ertel James Jr & Gayle Sutton Funding Llc Res. 236-0003-0028-00
2204 Kipling Ave 02/24/2009 $13,500 $93,300 -$79,800 R E Schweitzer Construction Company Skoczen Paul Res. 228-0002-0088-00
6003 Connecticut Ct 01/15/2009 $27,500 $106,230 -$78,730 Darnell Matt Secretary Of Housing And Urban Development Res. 228-0002-0117-00
6083 Pawnee Dr 03/12/2009 $30,900 $108,290 -$77,390 Waldon Gregory I & Sylvia Ib Property Holdings Llc Res. 229-0001-0083-00
1544 Ambrose Ave 01/21/2009 $16,700 $92,700 -$76,000 Cad Investment Group Llc Powers Troy Res. 233-0003-0146-00
1127 Cedar Ave 03/09/2009 $5,000 $78,400 -$73,400 Hayes Genia Tr Grant Georgianna Res. 236-0002-0040-00
6046 Budmar Ave 03/31/2009 $90,000 $159,950 -$69,950 Aurora Loan Services Llc Saade Properties Ltd Com. 233-0001-0108-00
7620 Bitteroot Ln 02/11/2009 $43,000 $111,520 -$68,520 Jeter Reginald Secretary Of Housing & Urban Development Res. 247-0005-0041-00
7870 Daly Rd 03/02/2009 $29,000 $95,260 -$66,260 Wade James Hsbc Mortgage Services Inc Res. 247-0005-0083-00
1544 Ambrose Ave 01/28/2009 $26,500 $92,700 -$66,200 Nguyen Quy & Chi Pham Cad Investment Group Llc Res. 233-0003-0146-00
1165 Lynnebrook Dr 02/13/2009 $18,000 $81,340 -$63,340 3 C Investments Inc Federal National Mortgage Association Res. 236-0002-0249-00
1172 Mosswood Ct 02/09/2009 $67,000 $130,340 -$63,340 Childs Natasha L Us Bank National Association Tr Res. 247-0005-0428-00
6708 Plantation Wy 01/05/2009 $90,000 $151,700 -$61,700 Newman Bobby Lynn U S Bank National Association Tr Res. 247-0007-0247-00
6041 Lantana Ave 03/30/2009 $16,000 $77,220 -$61,220 Foster Sandy Jr New York  Bank Of The Res. 235-0001-0046-00
6361 Meis Ave 02/03/2009 $64,000 $125,000 -$61,000 Bank Of New York Tr The Housley Theodore Res. 246-0002-0048-00
6046 Capri Dr 03/04/2009 $37,900 $97,000 -$59,100 Kennedy Thomas & Joyce Federal Natioanl Mortgage Association Res. 237-0001-0120-00
7850 Daly Rd 03/02/2009 $29,500 $88,200 -$58,700 Reith Scott Secretary Of Housing And Urban Development The Res. 247-0005-0081-00
1188 Toluca Ct 03/24/2009 $30,000 $87,500 -$57,500 Renaissance Men Propertie Llc Federal National Mortgage Association Res. 236-0001-0207-00
1059 Elda Ln 01/20/2009 $13,000 $70,170 -$57,170 Jacobs David Deutsche Bank National Trust Company Res. 236-0001-0187-00
1197 Lynnebrook Dr 03/26/2009 $56,000 $112,700 -$56,700 Federal National Mortgage Association Gates Marcus D Res. 236-0002-0256-00
1153 Groesbeck Rd 02/02/2009 $60,000 $113,680 -$53,680 Sutton Funding Llc Crawford Ronda Res. 236-0003-0028-00
1602 Larmon Ct 02/20/2009 $89,000 $142,590 -$53,590 Garcia Karen Quanita Metcalf Elyse Res. 234-0003-0073-00
2053 Connecticut Ave 02/02/2009 $63,600 $116,910 -$53,310 Lasalle Bank National Association Tr Knight Daniel J Res. 228-0002-0203-00
5956 Monticello Ave 01/13/2009 $106,000 $158,960 -$52,960 Clemen Linda M Federal National Mortgage Association Res. 228-0002-0222-00
1172 Mosswood Ct 02/09/2009 $80,000 $130,340 -$50,340 Us Bank National Association Tr Herring Letha & Kevin Res. 247-0005-0428-00
5818 Lathrop Pl 01/16/2009 $71,200 $120,150 -$48,950 Doddy Reginald N Duodu Margaret A Res. 229-0004-0021-00
7973 Cherrywood Ct 02/25/2009 $64,900 $112,700 -$47,800 Iles Nicole M Hsbc Mortgage Services Inc Res. 247-0005-0231-00
5711 Kiefer Ct 01/30/2009 $30,000 $75,360 -$45,360 Adkinson John Secretary Of Housing And Urban Development The Res. 236-0002-0276-00
1233 Toluca Ct 02/13/2009 $60,000 $105,000 -$45,000 Fannie Mae Paige Lois Res. 236-0001-0226-00
5660 Hamilton Ave 01/02/2009 $52,000 $96,530 -$44,530 National City Bank Wilson Yvonne Res. 234-0004-0086-00
1535 Ambrose Ave 01/14/2009 $20,000 $63,210 -$43,210 Federal National Mortgage Association Davis Patricia Res. 233-0003-0028-00
5711 Kenneth Ave 03/10/2009 $50,000 $91,140 -$41,140 Cco Mortgage Corporation Phillips Linda D Res. 236-0002-0167-00
2011 Parkhurst Ct 03/26/2009 $91,455 $132,500 -$41,045 Lasalle Bank National Association Tr Brown Stephen A & Vikee Res. 228-0002-0254-00
2038 Connecticut Ave 03/13/2009 $62,000 $101,630 -$39,630 Wells Fargo Bank N A Price Pamela R Res. 228-0002-0195-00
6310 Savannah Ave 01/12/2009 $56,000 $90,060 -$34,060 Wells Fargo Bank N A Evers Robert E Res. 232-0001-0013-00
6311 Heitzler Ave 01/21/2009 $55,000 $87,620 -$32,620 French David A & Kathleen E Pickens-Fren Henderer Norma Jean Res. 232-0004-0019-00
866 Oakfield Ave 01/27/2009 $69,900 $102,500 -$32,600 Suggs Dorothea H Holmes Jason E & Jessica Res. 237-0003-0061-00
6349 Heitzler Ave 01/22/2009 $92,000 $124,200 -$32,200 Deutsche Bank National Trust Company Tr Evans Michelle L Res. 246-0003-0052-00
5700 Kiefer Ct 01/05/2009 $64,000 $95,550 -$31,550 Sanders Bruce Cinfed Employees Federal Credit Union Res. 236-0002-0293-00
1153 Lynnebrook Dr 01/20/2009 $60,000 $90,160 -$30,160 Third Federal Savings & Loan Association Of Cle Douglas Latisha D Res. 236-0002-0246-00
1010 Ebony Ln 02/09/2009 $48,000 $76,140 -$28,140 Deutsche Bank National Trust Company Tr Curry Darryl & Bonita Res. 237-0001-0042-00
6365 Meis Ave 03/23/2009 $8,000 $35,100 -$27,100 Diegmueller James F Tr Fannie Mae Res. 246-0002-0047-00
6479 Daly Rd 03/03/2009 $71,900 $98,590 -$26,690 Long Kim Foster Daniel M Res. 247-0006-0111-00
1610 Dixon Cr 02/27/2009 $108,000 $131,900 -$23,900 Sheville Justin & Melissa Kay Radina Judith & Tamarra K Stringfield Res. 232-0004-0095-00
1622 Larmon Ct 03/05/2009 $118,000 $138,480 -$20,480 Patton Patrick J & Kristen Hanks Mcafee Jack A Res. 234-0003-0068-00
5300 Hamilton Ave 02/24/2009 $88,000 $97,090 -$9,090 Johnson Jerome A Tr & Loreda B Tr Wade William W Res. 230-0001-0089-00
1192 Cedar Ave 02/02/2009 $32,000 $39,100 -$7,100 Working In Neighborhoods Fannie Mae Res. 235-0003-0062-00
6110 Hamilton Ave 02/26/2009 $155,000 $158,200 -$3,200 6110 Hamilton Avenue Llc Elisha Community Redevelopment Corporation Com. 233-0003-0080-00
5722 Kiefer Ct 01/08/2009 $90,500 $89,960 $540 Jones Milton W Bray Earl Jr & Linda L Morris Bray Res. 236-0002-0288-00
5828 Saranac Ave 03/16/2009 $26,000 $24,900 $1,100 Federal Home Loan Mortgag Corporation Pinkelton Kenneth L Res. 233-0004-0110-00
5300 Hamilton Ave 01/02/2009 $140,000 $128,300 $11,700 Thiemann Mary Theresa Dunn Elaine F Res. 230-0001-0174-00
6069 Waldway Ln 01/02/2009 $80,000 $62,900 $17,100 Lamb Patrice M Yates Brian F & Helenlamor Res. 237-0001-0299-00
1532 Larry Ave 03/10/2009 $195,000 $176,300 $18,700 Digiovenale Victoria Hancock Betty Res. 247-0001-0019-00
5923 Lantana Ave 03/23/2009 $80,000 $49,900 $30,100 Nguyen Tinh Nguyen Chris T Res. 233-0004-0052-00
1714 Cedar Ave 01/16/2009 $57,750 $780 $56,970 Access Property Managemen Llc Gunn Sheila R Res. 233-0002-0115-00
5836 Saranac Ave 03/25/2009 $111,000 $9,000 $102,000 Rivera Shana M Working In Neighborhoods Res. 233-0004-0105-00

Saturday, June 02, 2007

College Hill Housing Development Team Progress Report

May 20, 2007

Housing redevelopment along Cedar Avenue in College Hill is alive and well. In the fall of 2005, a few participants of the College Hill Summit began meeting informally to see how we might be able to respond to the Katrina Hurricane disaster by organizing to offer housing to those needing relocation. However, the group learned was that having housing available for a disaster required much advance planning, and given that there was no advance plan, it was not possible to help further in an emergency situation. The group continued, however, and the vision for housing redevelopment moved to one of increasing home ownership in the College Hill community. So the Housing Development Team was born.

Soon the team learned that the rental rate in College Hill was approaching 40%, and this was no doubt contributing to the trend of declining quality of the housing is some parts of College Hill. As the team met, the vision for housing development emerged as follows:

Housing Improvement will help improve the overall quality of life in College Hill by catalyzing action on multiple issues. Housing improvement will focus on increasing home ownership and eliminating abandoned and ‘blighted’ homes. In partnership with residents and other community groups, the following will also happen:

  • Physical improvements are made to currently owned homes.
  • City infrastructure—streets, sidewalks, lighting— is improved.
  • More people actually own their homes vs. renting.
  • Neighborhoods and churches organize to help one another.
  • Drug and gang activity is eliminated.
  • Trash and litter is reduced and removed.
  • Residents are empowered to guide their destiny.

An “action plan” was developed to develop a proposal by early 2006 to engage leaders in the community and answer the question “What’s Next?” Here is the action plan from the fall of 2005:

The aim is to:

  • Focus initially on Cedar Avenue, from Argus to Hamilton.
  • Involve and collaborate with the residents and businesses on Cedar Ave, including renters as well as those who own the properties involved.
  • Establish the basic feasibility of this kind of project for improved housing, so that once Cedar is done, another street can be done as well.
  • Provide answers to the many questions that such a proposal will create
  • Involve all groups and organizations in the community in defining the project, and in organizing it.

As the team continued working there were more questions than answers. However, they worked to develop answers to each. These questions, with answers, are here.

In the process of developing an action plan, the team went through a number of steps in determining the current structure. Our goals were focused on improving housing in the Cedar Avenue neighborhood and increasing home ownership as planning for rehab and development progressed. With the decision to be a ‘not for profit’ effort, the question of ownership needed to settle with either a new legal entity or an existing one. Several options with existing community groups were explored, but they were overcommitted on other projects and were not able to assume the lead for the College Hill Housing effort. It was about that time that members of the team learned of the efforts of several Not-For-Profit housing redevelopers working in adjacent communities. A bid package was prepared, and the team found two organizations that were interested. After extensive interviews, and tours of properties that each had either rehabed or built new, the team chose Working in Neighborhoods (WIN) as our developer. This resolved the question of ownership, as WIN would manage the complete process from purchase to home sale and beyond.

So with the selection of housing developer behind them, the Housing Team set about developing an agreement with Working In Neighborhoods to guide the decision making process as the work moved forward. It was agreed, that rather than a ‘contract’, the team and WIN would be guided by a ‘covenant’. They believed that a covenant would capture the intentions of both parties, and would be more like a formal ‘handshake’ with the community, rather than a binding contract. The covenant developed captured the expectations of each party of the other, and provides the blueprint for ongoing work of WIN in collaboration with the College Hill Community and Residents. The Covenant agreed to is provided here.

Pictured at the Covenant signing are (from left to right): Dave Scharfeberger, WIN, Rev. Dan Weyand-Geise, Valerie Hershberger, Ron Cowgill, Sister Barbara Busch WIN, Joe Poole, Rev. “Chappie” Chapman, Phyllis Schoenberger, Rev. Sil Watkins, Ed Wells.

As the WIN and the Team has developed since the fall of 2006 when the Covenant was first drafted, the effort in moving forward has been truly a collaborative one. The progress report is positive, though all on the Team, and WIN would have hoped for faster progress. Early on, in the process of selecting a developer, Sister Barbara had advised that it would not be a ‘quick fix’ and there needed to be a concerted long term effort to demonstrate the needed progress. She cited examples of other communities where the effort at housing improvement has been sustained for years.

However, thanks to early gifts, initial purchases for properties were made. This avoided a delay of nearly six months in getting started. So, as of mid May, 2007, two properties have been acquired in the focus area. They are 1304 Cedar and 5836 Saranac. Unfortunately, none of the dwellings on these properties could be salvaged, as their condition rendered it most prudent to start from fresh.

The team hopes that construction of new homes can begin before the end of this year.

Demolition of the Saranac house was completed in April, and the house on 1304 Cedar was completed in mid May.

On May 19, the Housing Team hosted the residents of the Cedar Avenue and cross Streets from Salvia to Leffingwell at an old fashioned block party. The Housing Team members, WIN, and other groups interested in the residents were present to share what's next, and how to be involved in the program as it develops. Nearly 100 residents visited together with each other and team members during this time of sharing the vision, progress and future plans for improvement in home ownership and upgraded housing along Cedar Avenue in College Hill.

Ron Cowgill, for the Housing Team (513-494-2481, rcowgill@cinci.rr.com).

College Hill Housing Development Team Questions & Answers

 

This is the list of questions developed by the College Hill Housing Development Team during the progress of their work, along with the answers the team developed:

Q: What Organization in College Hill will lead the project?

A: The team concluded that it would be organized under the College Hill Forum’s Quality of Life Committee. The original team will function as a steering team for the project.

Q: Will this project be similar to others that are being developed in Cincinnati?

A: The team believes the approach is similar to other community groups working on housing, but no doubt is unique in organization structure.

Q: Will this be a non-profit or for profit project?

A: The team concluded this will be a not for profit activity. This led to choosing Cincinnati’s Working in Neighborhoods (WIN) as the developer.

Q: Where will the financial support for the project come from?

A: Financial support to establish seed money was donated through the Cincinnati Foundation. The team expects to get gap financing from the City of Cincinnati.

Q: What are the hopes and dreams of the residents of the involved street?

A: The team is still working to identify how residents will be involved.

Q: What model will be established for increasing home ownership?

A: The team has chosen as developer Cincinnati non profit housing group Working in Neighborhoods--WIN for short. Their model for developing high quality low income housing and placing it for sale to qualified home ownership is the model chosen.

Q: How will this project be fully synergistic with the development planned for Hamilton and North Bend?

A: At this point there is no direct relationship to the North Bend and Hamilton Development.

Q: Does this project include business property, rental housing, or just single family residences?

A: The focus is on single family residences.

Q: Should the project include training in home ownership?

A: Yes, the project will include training in home ownership. WIN’s approach is a strength.

Q: Should the project provide training in basic skills needed to complete the work of the project?

A: The team has learned that this is not a good format for training basic skills.

Q: Is the goal not only to eliminate 'blight' but to 'beautify' the neighborhood?

A: Beautifying the neighborhood will result as overall improvement in home ownership quality is improved.

Covenant between Working in Neighborhoods and the College Hill Housing Development Team

September 2006

I. Covenant Intention

This is a ‘good faith’ agreement between Working in Neighborhoods (WIN) and the College Hill Housing Development Team (CHHDT).

II. Objective

The objective of this covenant is to express, agree and commit to honor our mutual expectations for how we will work together for housing development in the College Hill area. These expectations derive from the desire of both parties to see significant improvement in the housing stock of the College Hill NRSA area.

III. Background and Vision

The neighborhood of College Hill has been dealing with many issues for a number of years, as have all the neighborhoods of Cincinnati. Among these issues is the noticeable deterioration of housing, rising from a variety of factors, such as an increase in rentals, a decline in home ownership, a lack of proper maintenance, and an increase in crime. The focus of CHHDT and WIN is on housing, but in doing so, the hope is for an overall improvement in the neighborhood, as expressed in CHHDT’s Vision Statement:

Housing Improvement will help improve the overall quality of life in College Hill by catalyzing action on multiple issues. Housing improvement will focus on increasing home ownership and eliminating abandoned and ‘blighted’ homes. In partnership with residents and other community groups, the following will also happen:

· Physical improvements are made to currently owned homes.

· City infrastructure—streets, sidewalks, lighting— is improved.

· More people actually own their homes vs. renting.

· Neighborhoods and churches organize to help one another.

· Drug and gang activity is eliminated.

· Trash and litter is reduced and removed.

· Residents are empowered to guide their destiny.


IV. Communication

This document outlines a working relationship between CHHDT and WIN which includes many references to communication. However, it is recognized that to be successful this relationship will require frequent, proactive, and personal verbal communication above and beyond what can realistically be outlined in this document. Therefore, this agreement is not intended to limit or replace in any way the ongoing communication between CHHDT and WIN.

V. When Revisions Are Needed

When issues and topics arise that have not been previously discussed, it is the expectation of both WIN and the College Hill Housing Development Team that these will be reviewed at a regular meeting of the joint parties and that this document will be revised when appropriate.

VI. We, the undersigned, commit to the following:

A. In Property Acquisition…

WIN will:

  • Buy on Cedar or immediately adjacent to Cedar (at least for the next 1-3 years).
  • Whenever appropriate and possible, Email or phone designated members of the CH Housing Team when an appointment is made to view a prospective property.

CHHDT will:

  • Tell WIN of available or about to be available properties. It is especially advantageous to acquire properties before they go into receivership or even before they go on the market.

B. In PreConstruction…

WIN will:

  • Seek to employ local contractors (thru the General Contractor).
  • Share specs, sketches or drawings, and estimates prior to start of construction with the Housing Team.
  • Plan to match neighborhood architecture.
  • Upgrade the housing whenever possible.

CHHDT will:

  • Provide list of recommended local contractors.
  • Commit to quick turnaround (within one week) of review of specs, sketches/drawings, and estimates.

C. In Financing…

WIN will:

  • Negotiate a new contract with the city to include funding for work in College Hill.

CHHDT will:

  • Support WIN in obtaining funds from the city.
  • Be present in discussions with the city.
  • Lobby, if necessary and appropriate.
  • Letters of support from community organizations.

D. In Rehab…

WIN will:

  • Ensure work is architecturally similar neighborhood.
  • Make first rehabbed houses extra attractive, to stand out and attract attention in the neighborhood.
  • Solicit input from the Housing Team on landscaping plant and flower selections.
  • Schedule periodic walk-thru opportunities for the Housing Team.
  • Use local suppliers whenever possible.

CHHDT will:

  • Watch over the property to prevent theft and vandalism.
  • Yard/landscape maintenance, including grass cutting and watering.
  • Help remove junk or clutter from houses, if necessary. (organize volunteers)
  • Help in demolition, if needed and appropriate. (organize volunteers) Decide on house-by-house basis.
  • Help get donations in-kind from local suppliers.

E. In Marketing and Sales…

WIN will:

  • Schedule open house for newly rehabbed houses.
  • If possible, schedule closing at the houses to enable creation of an “event” in the neighborhood.
  • Use local realtors when needed only as needed (realtors need to understand 2nd mortgage concept).

CHHDT will:

  • Make open house an “event” in the neighborhood.
  • Make closing an “event” in the neighborhood.
  • Help find prospective buyers for rehabbed properties.

F. In New House Construction (vs Rehab)…

WIN will:

  • Partner with Housing Team to develop mutually agreeable design prior to building.

CHHDT will:

  • Help with research on architectural styles and designs appropriate for the neighborhood.

VII. We have reviewed the above and fully commit to covenant together to approach the improvement in housing in the College Hill community in mutual parthership and shared vision:

Signatories to the Covenant were the following:

For the Housing Team:

  • Rev. Dan Weyand-Geise, College Hill Ministerium, Christ’s Community in College Hill
  • Phyllis Schoenberger, College Hill Forum Quality of Life, College Hill Business Association 
  • Joe Poole, Concerned Citizens of SE College Hill
  • Ed Wells, College Hill Forum Quality of Life Committee
  • Rev. Harold “Chappie” Chapman, Christ's Community in College Hill, College Hill Presbyterian Church
  • Rev. Sil Watkins, Golden Leaf Baptist Church
  • Valerie Hershberger, Summit Co-Facilitator, College Hill Presbyterian Church 
  • Ron Cowgill, Summit Co-Facilitator, College Hill Presbyterian Church

For WIN:

  • Sister Barbara Busch, Executive Director. WIN
  • Dave Scharfenberger, Director of Training, WIN
  • Dyah Kartikawening, Housing Development & Home Buyer Counseling, WIN